Demtech Razes Memorial Bridge

At the crack of dawn on October 16, 2002 Demtech, Inc. of Blue Springs, Missouri felled the 750-foot long Memorial Bridge in Radford, Virginia USA.

The over-deck truss span stood 100 feet over the New River, and had a total weight of 350,000 pounds. Demtech designed the explosive felling to remove all three sections simultaneously, attaching a total of 96 RDX linear shaped charges to critical support beams throughout the structure.

Various contracting teams worked through an unusually high level of anxiety during the pre-cutting, explosives loading and community outreach processes, as the Virginia Sniper attacks were affecting the region at this same time.

Nonetheless, the project went off as planned with no delays or complications reported.

  Enter your E-mail address below,
  and we'll keep you informed on site
  updates and future live events.